Baseline-systems BaseStation 6000 Manuale Utente Pagina 9

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 11
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 8
9
8. For the initial configuration, we recommend that the Total Active Zones field (7) be set to 1. Please see the
Concurrent Zone information at the end of this document.
9. Click the Return/Save button (8) at the bottom-right of the Set Watering Program Schedule window.
Hint: The information in the fields to the right of the Watering Time grid (9) provides a summary
of the settings for a selected RBU. If you want to see the settings for a different RBU, click the
arrow at the end of the Base Unit field and select an RBU from the list.
Baseline Inc.
Phone: 866.294.5847 · Fax: 208.323.1834 · www.baselinesystems.com
Vedere la pagina 8
1 2 3 4 5 6 7 8 9 10 11

Commenti su questo manuale

Nessun commento